Station 1: FFB reception, sterilization and oil
extraction
Station 2: Oil clarification, filtration &
dehydration, and sludge water pumping
Station 3: Depericarping, nut cracking and kernel
recovery
Station 4: Steam & power generation plant
FFB Reception, Sterilization and Oil Extraction
Fresh fruit bunches (FFB) received at the reception bay are weighed,
graded and manually loaded into the skip elevator for feeding into two Vertical
Sterilizers and subjected to steaming at a pressure of about 3.16bar.g
for 90 minutes.
The sterilized fruit bunches (SFB) are automatically fed into a
rotating drum of the Bunch Stripper where the fruits are
separated. The separated fruits are transported by skip elevator into a Digester.
The digested mash is fed by gravity into a Twin-Screw
Press for oil extraction.
Oil Clarification
After a filtering process
to remove most of the fiber residues, the crude palm oil mixture is fed into a Static
Settling Tank for continuous oil separation. The skimmed oil is fed
into the Second Static Tank for more refined clarification. The
clarified oil is filtered through a Dehydrator to reduce its moisture
content to 0.1%.
This Clarification plant is designed to recover and purify the crude
palm oil quickly with minimum heating and air exposure to minimize oxidation of
palm oil.
Kernel Recovery
The press cake comprising of fiber and nuts is transported through a
Cake
Breaker Paddle Conveyor which helps break up the nuts from the fiber
and reduce moisture. The fiber and nuts are separated in a Pneumatic Winnowing Column.
Cracking of the nuts are done by a Ripple Mill and the crack mixture is
fed through a Claybath for separation. The washed kernels are dried in a
drying silo to moisture content of 7% before storage.
Steam & Power Plant
The steam for power generation and FFB sterilization is supplied by
a 10mt/hr Steam Boiler using fruit fiber and shell as solid fuels. Power
generation of about 300kW is achieved by the Steam Turbine Driven Alternator.
A main genset of 300kW and an auxillary genset of 100kW are to provide standby
power supply.
For further enquiries, please contact:
CIMG Resources Sdn Bhd
Malaysia
Email: cimgrs@yahoo.com
For further enquiries, please contact:
CIMG Resources Sdn Bhd
Malaysia
Email: cimgrs@yahoo.com
No comments:
Post a Comment